Introduction:
Integrated Consulting Group is a consulting office specialized in the field of design and supervision of electrical/mechanical works, light current, control, and communication networks in the different applications. The office is established in 1991, and includes a highly qualified teamwork in such fields aided with up to date computer skills and technology. Moreover, the office cooperates with specialists, on highest level, in other fields depending on the required works for different projects. The working field containing the following projects which are designed completely and/or under supervision. For further detail please Contact Prof. Dr. Engineer/ Hesham Kamel Abd-El-lateef Temraz.
Consultation Disciplines:
The following electro-mechanical consultation disciplines are available, and are conducted throughout several projects:
- Medium voltage electrical networks
- Low voltage electrical networks.
- Elevators and diesel engines.
- Telephone networks
- Master satellite networks.
- CCTV monitoring and surveillance systems.
- Wireless conference and voting systems.
- Fire alarm systems.
- Interpretation systems.
- Sound reinforcement systems.
- Projection systems.
- Sound and PABX networks.
- HVAC systems.
- Fire fighting systems.
- Water and plumbing
- Building management systems BMS.
- Instrumentation & control
- Data Centers
Consultation Activities:
Integrated Consulting Group (ICG) consultation activities are divided into four major sectors: new urban communities, touristic villages, general buildings, industrial facilities and water and wastewater pumping stations. The work under each section can be briefly described as follows:
1. New urban communities:
The scope of work includes the design and supervision of electrical and telephone networks. Detailed design of each area is approved form local authorities, e.g., Distribution Company, Egyptian Tele-communication Company and ministry of new urban communities. The scope of work includes the submission of specifications and
bill of quantities along with the tender general requirements. The job description under this section includes the following sites for both electrical and telephone networks:
- El-OBOUR City (Area 16000 acre approximately)
- Owner: New Urban Communities
- Project period: 1993 – 2012
- Total Estimated cost of work: 240000000 L.E.
-
- Second Residential Zone, El-Obour City - Cairo.
- Heavy Industrial Zone, El-Obour City - Cairo.
- Medium and lightly Industrial Zone, El-Obour City - Cairo.
- Sixth Residential Zone, El-Obour City - Cairo.
- Seventh Residential Zone, El-Obour City - Cairo.
- Fifth Residential Zone, El-Obour City - Cairo.
- Ninth Residential Zone, El-Obour City - Cairo.
- Fourth Residential Zone, El-Obour City - Cairo.
- Third Residential Zone, El-Obour City - Cairo.
- Industrial Zone (B and C), El-Obour City - Cairo.
- Future Residential Zone, 100 m2 and 70 m2, El-Obour City - Cairo.
- Leisure Zone, El-Obour City - Cairo.
- Sixth of October City (Area 60000 acre approximately)
- Owner: New Urban Communities
- Project period: 1993 – up till now
- Total Estimated cost of work: 600000000 L.E.
-
- Tourists Village (West Sumid), 6th October City-Cairo-Egypt.
- North Expansions (1st Tourist Zone), 6th October City-Cairo.
- North Expansions (2nd Tourist Zone), 6th October City-Cairo.
- North Expansions (3rd Tourist Zone), 6th October City-Cairo.
- East Tourist Expansions, 6th October City-Cairo.
- North Industrial Expansions, 6th October City-Cairo.
- Youth Residential Zone, 6th October City-Cairo.
- El-Mokhabarat Residential, 6th October City-Cairo.
- Third Industrial Zone, 6th October City-Cairo.
- Fifth Industrial Zone, 6th October City-Cairo.
- Garden Zone, South Residential Zone, 6th October City-Cairo.
- Center Axial Zone, 6th October City-Cairo.
- Fourth and Sixth Tourists Village Zone, 6th October City-Cairo
- New Cairo City Congregations (1-2-3)
- (Area 47000 acre approximately)
- Owner: New Urban Communities
- Project period: 1995 – up till now
- Total Estimated cost of work: 800000000 L.E.
-
- First Residential Zone, 5th Congregations. Cairo City.
- Second Residential Zone, 5th Congregations. Cairo City.
- Third Residential Zone, 5th Congregations. Cairo City.
- Fourth Residential Zone, 5th Congregations. Cairo City.
- Fifth Residential Zone, 5th Congregations. Cairo City.
- South Police Academy, 5th Congregations. Cairo City-Egypt.
- Forest North Zone, 5th Congregations. Cairo City-Egypt.
- El-Violet (2) Zone, 5th Congregations. Cairo City-Egypt.
- El-Violet (1) Zone, 1st Congregations. Cairo City-Egypt.
- Youth Residential Zone (North & South) 1st Congregations. Cairo City
- Residential districts (2-4) 1st Congregations. Cairo City-Egypt.
- Residential districts (3-5) 1st Congregations. Cairo City-Egypt.
- Residential districts (7-9) 1st Congregations. Cairo City-Egypt.
- Residential districts (11-12-13-14) 1st Congregations. Cairo City.
- Youth Residential Zone (stage three) 1st Congregations. Cairo City.
- Residential districts (1-2-3-4) (stage three) 1st Congregations. Cairo.
- Residential districts (5-6-7) (stage three) 1st Congregations. Cairo.
- Investors North and South Zone, 5th Congregations. Cairo City.
- El-Showifat Zone, 5th Congregations. Cairo City.
- El-Golf West Zone, 5th Congregations. Cairo City.
- Cairo City New Center, Cairo.
- First Residential Congregations Center, Cairo.
- Industrial Zone, 3rd Congregation, Cairo.
- North east extensions, 1st Congregation, Cairo.
- South east extensions, 5th Congregation, Cairo.
- El-Sheikh Zayed City (Area 6300 acre approximately)
- Owner: New Urban Communities
- Project period: 1996 – 2012
- Total Estimated cost of work: 160000000 L.E.
-
- Residential districts (5-6), El-Sheik Zayed City. Cairo-Egypt.
- Crazy Water Tourist Zone, El-Sheik Zayed City. Cairo-Egypt.
- Seventh Residential Zone, El-Sheik Zayed City. Cairo-Egypt.
- Ninth Residential Zone, El-Sheik Zayed City. Cairo-Egypt.
- Eleventh Residential Zone, El-Sheik Zayed City. Cairo-Egypt.
- Thirteenth Residential Zone, El-Sheik Zayed City. Cairo-Egypt.
- Sixteenth Residential Zone, El-Sheik Zayed City. Cairo-Egypt.
- Youth Residential Zone, El-Sheik Zayed City. Cairo-Egypt.
- Second Residential Zone, El-Sheik Zayed City. Cairo-Egypt.
- Fourth Residential Zone, El-Sheik Zayed City. Cairo-Egypt.
- Center Pivot Zone, El-Sheik Zayed City. Cairo-Egypt.
- The Diplomatically Zone, El-Sheik Zayed City. Cairo-Egypt.
- Bourg El-Arab El-Gededa (Area 1000 acre approximately)
- Owner: New Urban Communities
- Project period: 1998 – 2001
- Total Estimated cost of work: 12000000 L.E.
-
- Commercial and Industrial Center Axial Zone, Alexandria - Egypt.
- Souhag El-Gededa (Area 6000 acre approximately)
- Owner: New Urban Communities
- Project period: 2003 – up till now
- Total Estimated cost of work: 140000000 L.E.Industrial Zone part A, Souhag, Egypt.
-
- Family Housing part A, Souhag, Egypt.
- Industrial Zone part A, Souhag, Egypt.
- Eskan Kawmi, Souhag, Egypt.
- University and academic institutes zone, Souhag, Egypt
- Ebni Betak (1,3), Souhag, Egypt.
- City central spine, Souhag, Egypt.
- Third residential zone, Souhag, Egypt
- El-Menia El-Gededa (Area 8400 acre approximately)
- Owner: New Urban Communities
- Project period: 2003 – up till now
- Total Estimated cost of work: 70000000 L.E.
-
- Family Housing part A, Menia, Egypt.
- Assuiot El-Gededa (Area 1910 acre approximately)
- Owner: New Urban Communities
- Project period: 2015 – up till now
- Total Estimated cost of work: 100000000 L.E.
-
- Distinguished residential area, 330 feddan, Menia, Egypt.
- Commercial residential area, 110 feddan, Menia, Egypt.
- Social residential housing (buildings), 490 feddan, Menia, Egypt.
- Social residential housing (plots), 510 feddan, Menia, Egypt.
- Central spine area, 230 feddan, Menia, Egypt.
- Industrial area, 240 feddan, Menia, Egypt.
- Tiba El-Gededa (Area 1100 acre approximately)
- Owner: New Urban Communities
- Project period: 2015 – up till now
- Total Estimated cost of work: 70000000 L.E.
-
- Social residential area (phase 1), 480 feddan, Luxor, Egypt.
- Social residential area (phase 2), 620 feddan, Luxor, Egypt.
2. Tourist Villages:
The scope of work under this section includes the design, preparation of tender documents and supervision of electro-mechanical work. In the field of electrical networks, the scope includes defining the supply source, preparation of medium tension
switch boards, work-shop drawings and defining transformers capacity based on calculated loads and its locations. Medium and low voltage networks are then defined. Moreover, the scope includes preparation of street lighting and landscape networks. The complete design is approved by the local distribution company, after which a complete bill of quantity is prepared. In the light current field, the scope includes design, preparation of tender documents and supervision of audio networks, telephone, master satellite, fire alarm and interactive systems. HVAC systems include the design of chillers, AHU, FCU, pumps, ductwork, fans and associated BMS systems. Work under this section includes the following projects:
- Golf City, Egyptian Engineers for Contracting & Integrated Housing, Area 500 acre, estimated scope of work cost 20 M L.E., 1991, El-Obour City - Cairo.
- Green Land, Egyptian Engineers for Contracting & Integrated Housing, Residential City, Area 500 acre, estimated scope of work cost 15 M L.E., 1991, El-Shrouk, Cairo.
- Ahmed Orabi Garden (El-Goroud 1-2), residential complex, Ahmed Orabi Society, estimated scope of work cost 8 M L.E., 1991, Ismallia road - Cairo.
- Green Oasis, BDH Real-Investment Company, residential complex containing villas, Area 35 acre approx., estimated scope of work cost 4 M L.E., 1995, El-Shrook, Cairo, Egypt.
- Gratta, Gratta Real-Investment Company, residential city containing villas, Area 12 acre approximately, estimated scope of work cost 3 M L.E., 1992, El-Shrook, Cairo, Egypt.
- El-Dabaa, Eldabaa Real-Investment Company, residential city containing villas, Area 30 acre approx., estimated scope of work cost 4 M L.E., 1992, El-Shrook, Cairo, Egypt.
- Bourevag Resort (first stage), Wady El-Nile Company, tourist resort containing residential units, estimated scope of work cost 6 M L.E., 1992, Fayed, Ismallia, Egypt.
- Bourevag Resort (second stage), Wady El-Nile Company, tourist resort containing villas, estimated scope of work cost 4 M L.E., 1994, Fayed, Ismallia, Egypt.
- Swiss Village Extension (Beach Albarawtes), Egyptian Swiss Co., For Tourism, estimated scope of work cost 4 M L.E., 1994, Hurgada, Egypt.
- Alf Lila Village, Egyptian Swiss Company, for Tourism, Village include the group of restaurants, estimated scope of work cost 6 M L.E., 1995, Hurgada, Egypt.
- El-Nakhil Village, tourist villages include a group of villas and residential units – Arab-union Company, estimated scope of work cost 12 M L.E., 1997, El-Ain El-Sokhna. Egypt.
El-Wally Village, (El-Rowda), El-Wally East Real Investment Co., Residential City include Villas and Residential Units, Area 100 acre, estimated scope of work cost 8 M L.E., 1997, 6th October City, Cairo, Egypt. - The Alexander Great resort, Middle East Real Investment Company. Tourist village include 450 Hotel-Room, estimated scope of work cost 30 M L.E., 1999, Marsa Alam, Egypt.
- Cesar resort, Cesar for Real Investment Company, include four hotels, Golf course and marina, estimated scope of work cost 45 M L.E., 2001, Marsa Alam, Egypt.
- El-Salam Concorde hotel, El-Salam Co., includes 400 hotel rooms and eight special villas, estimated scope of work cost 30 M L.E., 1999, Sharm El-Sheikh, Egypt.
- Swiss resort, El-Dawliah for Real Estate and Tourist Investment estimated scope of work cost 12 M L.E., 1997, Sharm El-Shiekh, Egypt.
- Holiday Sharm resort estimated scope of work cost 18 M L.E., 1997, Sharm El-Shiekh, Egypt.
- El-Bostan resort, Supreme council for tourist police, Residential City, includes villas and residential units, Area 100 acre, estimated scope of work cost 8 M L.E., 1998, 6th October City, Cairo – Egypt.
- El-Bostan resort, Supreme council for tourist police, tourist village includes villas and residential units, estimated scope of work cost 12 M L.E., 1998, North Sinai, Egypt.
- Emco (El-Solimania), Eng. Soliman Amer, residential city, includes villas, Area 150 acre, estimated scope of work cost 10 M L.E., 1998, El-Shiekh Zayed City, Cairo.
- El-Massrien, Egyptian Company for Investment and Development, residential city, Area 25 acre, estimated scope of work cost 4 M L.E., 1999, 6th October City, Cairo.
- Heliopolis, Misr El-Gadeda Company for Housing, residential city, medium class level, Area 120 acre, estimated scope of work cost 12 M L.E., 2000, El-Obour City, Cairo, Egypt.
- Modica, Modica Company for Development & Real Estate, residential villas, high-class level, Area 22 acre, estimated scope of work cost 4 M L.E., 2000, Fifth congregation, Cairo, Egypt.
- Lamy Land, El-Shiekh Talaat Lamy, Residential City, high class level villas, Area 80 acre, estimated scope of work cost 10 M L.E., 1999, 6th October City, Cairo.
- El-Tayseer, El-Tayseer Company for Investment Real estate, residential city includes villas and residential architectures, Area 28 acre, estimated scope of work cost 4 M L.E., 1998, Fifth congregation, Cairo.
- Zezenia, El-Asher Investment Company, residential and industrial city, Area 500 acre, estimated scope of work cost 20 M L.E., 2001, 10th Ramadan City, Cairo.
- El-Shabab resort, presidential general chamberlain, residential and administrative complex, estimated scope of work cost 30 M L.E., 2001, sharm el-Shiekh, Egypt.
- El-Ashgar City, International Co. for touristic projects (intours), a high-class residential complex includes villas and residential buildings, 180-Acre approx., estimated scope of work cost 16 M L.E.,2002,6 Th.Oct. city, Egypt.
- Royal City, 6 th. Oct. Company for development, a high-class residential complex includes villas, buildings and administration offices, 450-Acre approx., estimated scope of work cost 65 M L.E., 2003, El-Shiekh Zayed city, Egypt.
- Green Hill, Green Hill Co. for Development, a residential city, Area 46 acre, estimated scope of work cost 6 M L.E., 2004, 6 th. Oct. city, Cairo.
- Gardenia Park 2, International Co. for touristic projects (intours), a high-class residential complex includes villas and residential buildings, 80-Acre approx., estimated scope of work cost 8 M L.E.,2005, 6 Th. Oct. city, Egypt.
- El-Karma 2, Badr El-Din Co. for real estate projects (Karma), a high-class residential complex includes villas and residential buildings, 40-Acre approx., estimated scope of work cost 6 M L.E.,2005, Shiekh Zayed city, Egypt.
- Villar Residence, El-Dewan Co. for investments and touristic projects, a high-class residential complex includes villas and residential buildings, 80-Acre approx., estimated scope of work cost 8 M L.E.,2005, New Cairo city, Egypt.
- Lake View Resort, Arabian Co. for real estate projects (Eng. Emad El-Hazek), a high-class residential complex includes villas and residential buildings, 450-Acre approx., estimated scope of work cost 40 M L.E., 2005, New Cairo city, Egypt.
- El-Karma 3, Badr El-Din Co. for real estate projects (Karma), a high-class residential complex includes villas and residential buildings, 30-Acre approx., estimated scope of work cost 4 M L.E.,2005, Shiekh Zayed city, Egypt.
- Lake View Hotel (Dussit Thani), Arabian Co. for real estate projects (Eng. Emad El-Hazek), a five-star 400 rooms hotel including all service facilities, estimated scope of work cost 50 M L.E., 2007, New Cairo city, Egypt.
- Mena-Concorde, Mena Co. for real estate and development, a high-class residential complex includes villas and residential buildings, 50-Acre approx., estimated scope of work cost 10 M L.E.,2007, New Cairo city, Egypt.
- Residential complex El-Narges (El-Dar), (El-Mokhabarat), a high-class residential complex includes villas, club public and residential buildings, 400-Acre approx., estimated scope of work cost 100 M L.E.,2007, New Cairo city, Egypt.
- Katamya Gardens, North Africa Co. for real estate projects, a high-class residential complex includes villas and residential buildings, 110-Acre approx., estimated scope of work cost 35 M L.E., 2008, New Cairo city, Egypt.
- Mena-Sumid, Mena Co. for real estate and development, a high-class residential complex includes villas and residential buildings, 50-Acre approx., estimated scope of work cost 10 M L.E.,2008, New Cairo city, Egypt.
- Oriental resort, Oriental for industrial development and touristic buildings, a 5-star touristic resort with 400 rooms and 200 suits, estimated scope of work cost 45 M L.E., 2008, Sharm el-Shiekh, Egypt.
- High Gate, Mirette Group, a 4 star touristic resort with 660 appartments (both single and dual) rooms, estimated scope of work cost 65 M L.E., 2008, Hurgada , Egypt.
- Stone towers, Rooya group for real investment, a commercial/administrative building located on 40 feedan with 18 buildings 14 story and a five-star 500 room hotel, estimated MEP work 700 M L.E., new Cairo, Egypt.
- El-Karma 4, Badr El-Din Co. for real estate projects (Karma), a high-class residential complex includes villas and residential buildings, 62-Acre approx., estimated scope of work cost 12 M L.E.,2010, Shiekh Zayed city, Egypt.
- Arabella complex, Arabella touristic and urban development, administrative/commercial/hotel complex includes 5 commercial/administrative buildings and 150 room hotel with total built up area 120000 sq m, estimated scope of work 100 M L.E.,2010, new Cairo city, Egypt.
- Mena el-Baron, Mena for touristic and real estate development, A residential and commercial complex located on 110 acres approx., 2010, new Cairo, Egypt.
- Garden Hieghts, DAMAC. for real estate projects, a high-class residential, commercial complex includes villas and residential buildings, 300-Acre approx., estimated scope of work cost 35 M L.E.,2012, New Cairo city, Egypt.
- October Gardens, Technical company for real estate developments, a high-class residential, commercial complex includes villas and residential buildings, 80-Acre approx., estimated scope of work cost 12 M L.E.,2013, 6th of October city, Egypt.
- Maadi Resort, Maadi company for developments, a high-class residential, commercial complex includes villas and residential buildings, 136-Acre approx., estimated scope of work cost 45 M L.E.,2015, Shourouk city, Egypt.
- Mountain View Garden Hieghts, Dar El-Mamar Group, a high-class residential, commercial complex includes villas and residential buildings, 200-Acre approx., estimated scope of work cost 67 M L.E.,2015, New Cairo city, Egypt.
- Mountain View Chill out park, Dar El-Mamar Group, a high-class residential, commercial complex includes villas and residential buildings, 200-Acre approx., estimated scope of work cost 50 M L.E.,2016, 6th of October city, Egypt.
- Moon Valley (3), Arabia Group for developments, a high-class residential, commercial complex includes residential buildings, 80-Acre approx., estimated scope of work cost 25 M L.E.,2016, New Cairo city, Egypt.
- Mountain View I city New Cairo, Dar El-Mamar Group, infra-structure master plan of a high-class residential, commercial complex includes villas and residential buildings, 500-Acre approx., estimated scope of work cost 400 M L.E., 2017, New Cairo city, Egypt.
- Azzad, Tameer Company for real estate and development, a high-class residential, commercial complex includes residential buildings, 20-Acre approx. phase (A), estimated scope of work cost 76 M L.E., 2017, New Cairo city, Egypt.
- Porto New Cairo, Porto Group, a high-class residential, commercial complex includes restaurants, mall, and residential buildings, 140000 sq.m. residential and 86000 sq.m commercial areas, 20-Acre approx., estimated scope of work cost 150 M L.E.,2017, New Cairo city, Egypt.
- Mountain View I city October, Dar El-Mamar Group, infrastructure master plan of a high-class residential, commercial complex includes villas and residential buildings, 500-Acre approx., estimated scope of work cost 500 M L.E., 2018, 6th of October city, Egypt.
- The Selection, Almaza Bay, TRAVCO, a high-class residential, complex includes villas and residential buildings, 20-Acre approx., estimated scope of work cost 30 M L.E.,2018, North coast, Marsah Matrouh, Egypt.
- Bay Homes, Almaza Bay, TRAVCO, a high-class residential, complex includes villas and residential buildings, 40-Acre approx., estimated scope of work cost 50 M L.E.,2019, North coast, Marsah Matrouh, Egypt.
- CAVO, TRAVCO, a high-class residential, complex includes villas and residential buildings, 110-Acre approx., estimated scope of work cost 300 M L.E.,2019, Sokhna, Suez, Egypt.
- MAJADA, IWAN, a high-class residential, complex includes villas and residential buildings, 100-Acre approx., estimated scope of work cost 150 M L.E.,2019, Sokhna, Suez, Egypt.
- ICNC Club District, Dar El-Mamar Group, a high-class residential, commercial complex includes villas and residential buildings, 114-Acre approx., estimated scope of work cost 200 M L.E., 2021, New Cairo city, Egypt.
- ICNC Heart Work, Dar El-Mamar Group, a high-class residential, commercial complex includes villas and residential buildings, 18-Acre approx., estimated scope of work cost 35 M L.E., 2021, New Cairo city, Egypt.
- ICNC MVIII, Dar El-Mamar Group, a high-class residential, commercial complex includes villas and residential buildings, 28-Acre approx., estimated scope of work cost 60 M L.E., 2021, New Cairo city, Egypt.
- ICOC Club District, Dar El-Mamar Group, a high-class residential, commercial complex includes villas and residential buildings, 91-Acre approx., estimated scope of work cost 180 M L.E., 2021, 6th of October city, Egypt.
- ICNC Mountain Park, Dar El-Mamar Group, a high-class residential, commercial complex includes villas and residential buildings, 44-Acre approx., estimated scope of work cost 60 M L.E., 2022, New Cairo city, Egypt.
- ICNC MV Park, Dar El-Mamar Group, a high-class residential, commercial complex includes villas and residential buildings, 58.5-Acre approx., estimated scope of work cost 120 M L.E., 2022, New Cairo city, Egypt.
- ICOC MV Park, Dar El-Mamar Group, a high-class residential, commercial complex includes villas and residential buildings, 68-Acre approx., estimated scope of work cost 140 M L.E., 2022, 6th of October city, Egypt.
3. Commercial Centers – Factories – Clubs – Roads – Buildings:
The field of work includes design, preparing tender documents and supervision for electrical and light current networks and HVAC systems. Moreover, preparation of workshop drawings is conducted in some projects. The work through this section contains the following projects:
- Carmen Paper Factory, Eng. Mahmood Bakr, 6 th. Oct. city, industrial zone, estimated scope of work cost 3 M L.E., 1991, Cairo, Egypt.
- El-Shorouk Club, Ministry of new urban communities, estimated scope of work cost 50 M L.E., 1991, Cairo, Egypt.
- Fun Fair estimated scope of work cost 2 M L.E., 1992, Sharm El-Shiekh, South Sinai, Egypt.
- Galva metal, Galvanization Factory, El-Obour for Metal Industry Company, estimated scope of work cost 20 M L.E., 1993, El-Obour City, Cairo – Egypt.
- Galva metal, cold rolling Factory, El-Obour for Metal Industry Company, estimated scope of work cost 35 M L.E., 1997, El-Obour City – Cairo - Egypt.
- El-Khair Mall, Dr. Mohamed Khairy, high commercial center three stories, estimated scope of work cost 6 M L.E., 1997, El-Shrouk City, Cairo, Egypt.
- Marble Art Factory, Eng. Hossam Zietoon, Preparation Marble Co., estimated scope of work cost 2 M L.E., 1996, El-Obour City, Cairo, Egypt
- 6th October Club, 6th October City, Integrated activities Sporting Club, Area 40 acre approximately, estimated scope of work cost 6 M L.E., 1999, Cairo, Egypt
- Emerald Buildings (Dreamland), Fourth Contracting Co., estimated scope of work cost 6 M L.E., 1999, Cairo, Egypt
- N. A. Road, Arab contractors, Helwan branch, estimated scope of work cost 2 M L.E., 1996, Nasr City, Cairo, Egypt
- Moharam Bek Bridge, Arab Contractors, Alexandria Branch, estimated scope of work cost 4 M L.E., 1999, Alexandria City, Egypt
- Hurgada-Safaga Entrances Lighting estimated scope of work cost 6 M L.E., 2000, Red-Sea, Egypt.
- Developing Park zones Airport Cairo, estimated scope of work cost 20 M L.E., 2002, Cairo port Community
- Industrial Education College estimated scope of work cost 12 M L.E., 1997, Arab Contractors, Bany-Sweaf branch, Bany-Sweaf City, Egypt.
- Youth Housing, Egyptian Contracting Company, El-Abd, El-Obour City, Egypt.
- Random Housing Development, Manshiat Naser, estimated scope of work cost 6 M L.E., 1998, Homeless Housing Great Cairo Development Organization, Cairo.
- Cooperative Housing, convention housing includes low and medium-housing class levels with different areas in different zones in new Cities, estimated scope of work cost 20 M L.E., 1997, Cairo, Egypt.
- Partitioning Housing Project, National Building Company for construction, Residential City included Buildings with different levels, Area 750 acre, estimated scope of work cost 25 M L.E., 1997, 6th October City, Cairo.
- Partitioning Housing Project, Constructive Tourism for Housing and Cinema, Residential City include Buildings with different levels, Area 750 acre, estimated scope of work cost 25 M L.E., 1998, 6th October City, Cairo.
- Heliopolis Sporting Club, Integrated Activities Sporting Club with Area 57 acre, estimated scope of work cost 25 M L.E., 1999, El-Shrouk City, Cairo.
- Mubark Police Academy, Police Academy, estimated scope of work cost 100 M L.E., 1998, New Cairo City, Egypt.
- Partitioning Housing Project, General Administration Investigator Cairo, residential City includes 141-divided area, estimated scope of work cost 6 M L.E., 2002, El-wasta Hill, El-Madi, Egypt.
- Partitioning Housing Project, General Administration Investigator to Executive Paleontology, estimated scope of work cost 8 M L.E., 1999, 6th October City, Cairo.
- Marsa Alam Airport Staff Housing, EMAC Marsa Alam for touristic development, a residential complex for staff housing consists of several buildings, estimated scope of work cost 6 M L.E., 2001, Marsa Alam, Egypt.
- Suzan Mubark educational Hospital, University of Menia, estimated scope of work cost 20 M L.E., 2001, Menia, Egypt.
- Coastal road lighting estimated scope of work cost 6 M L.E., 2001.
- Development of Cairo east entrances, El-Nozha bridge, El-Marghany bridge - El-Mattar bridge, El-Oruba tunnel, estimated scope of work cost 15 M L.E., 2003.
- Presidential headquarters, 2000, Sharm El-Shiekh.
- Presidential headquarter, 2001, Bourg El-Arab.
- Presidential lounge, 2001, Cairo airport.
- El-Nasr Place, 2001, Cairo, Egypt.
- Presidential headquarters, 2002, Alexandria.
- Presidential headquarters, 2003, Cairo.
- Republican guard convention center, 2003, Cairo, Egypt.
- Egyptian Contractors Union Building, Administrative building 11 stories, estimated scope of work cost 18 M L.E., 2004, Cairo, Egypt.
- Air Force general hospital, a 70000 m2 hospital, estimated cost 25 M L.E., 2005, Cairo.
- Housing and Development Bank, Administrative building consists of 22 floors, supervision of electro-mechanical works, estimated cost 17 M L.E., 2005, Cairo
- Red Sea Governorate building, administrative building, estimated cost 13 M L.E., Hurgada, 2005, Egypt.
- Katamya Downtown, Arabian Co. for real estate projects (Eng. Emad El-Hazek), a 160000 m2 commercial/administrative building, estimated scope of work cost 75 M L.E., 2007, New Cairo city, Egypt.
- Housing and Development Bank, plot (80) Administrative building consists of 8 floors with a total plot area of 26000 sq. m., estimated cost 32 M L.E., 2008, New Cairo city, Cairo.
- ARKAN, Badr El-Din Co. for real estate projects, a high-administrative /commercial building with total plot area 60000 sq. m., estimated scope of work cost 50 M L.E.,2008, Shiekh Zayed city, Egypt.
- FPI, Future Pipe Services Company, plots (39 & 40), two administrative buildings each consists of 7 floors with approximate area of each 7000 m2 plus two basements, estimated scope of work cost 70 M L.E.,2010, New Cairo city, Egypt.
- Concorde mall, Concorde for real investment, an 8000 sq m administrative building, estimated scope of work 30 M.L.E., 2010, new Cairo, Egypt.
- El-Ahram, El-Ahram enterprise, Electrical plant room and secondary system complete renovation, estimated scope 30 M.L.E., 2011, Cairo, Egypt.
- Heinz, HFI, an electromechanical renovation and upgrade for factory located in industrial zone, estimated scope 20 M.L.E., 2012, Sixth of October city, Egypt.
- Baraka building, Baraka for trading and investment, A 16000 sq.m. administrative building, plot 63, estimated scope 20 M.L.E., 2013, new Cairo, Egypt.
- Concorde building, Concorde for real estate developments, A 8000 sq.m. administrative building, estimated scope 30 M.L.E., 2014, new Cairo, Egypt.
- Mountain view Administrative Dar El-Mamar Group, A 7000 sq.m. administrative building estimated scope 60 M.L.E., 2015, new Cairo, Egypt.
- Black Ball, Concorde for real estate developments, A 10000 sq.m. squash academy, estimated scope 60 M.L.E., 2017, new Cairo, Egypt.
- National universities, ministry of higher education, 11 national universities distributed among Egypt, each university contains 7 faculty buildings, each 8800 sq.m. and one administrative building, estimated scope 1200 M.L.E. per university, 2020, Egypt.
- Semi Fried Potato Factory, National Service Projects Organization, estimated scope 2000 M.L.E, 2020, El Owaniat, Egypt.
- 57357 Hospital, National Service Projects Organization, National contracting Company, estimated scope 180 M.L.E, 2023, Cairo, Egypt.
- Health Psychiatric Hospital, National Service Projects Organization, National contracting Company, estimated scope 40 M.L.E, 2023, Menia, Egypt.
- Industrial Zone, National Service Projects Organization, A 400-Acre industrial area with different production factories Date/ Wood/ Sugar and a residential area, estimated scope 5000 M.L.E, 2023, Toshka, Egypt.
4. Water and Sewage main Booster Stations:
The field of work includes the design, preparing tender documents and supervision for electric works and control, including main power station, pumping room, MCC and automation. Workshop drawings are conduced for some projects.
The work through this section containing the following projects:
- Main Pumping Station 6th October City.
- Main Pumping Station, Abu-Rdees, Sinai, Egypt.
- Main Pumping Station, Abu-Zinema, Sinai, Egypt.
- Mid-Sinai Pumping Station, Sinai, Egypt.
- Red-Sea Pumping Station, Red-Sea, Egypt.
- Main Pumping Station, El-Shrouk, El-Shrouk City, Egypt.
- Main Pumping Station, Abu-Zinema (1) and (2), Sinai, Egypt.
- Marina Pumping Station, North Coast, Egypt.
- Main Pumping Station, 61.5 Kilometer, Abu-Rdees – Sinai, Egypt.
- Main Pumping Station, 116.0 Kilometer, Abu-Rdees – Sinai, Egypt.
- West Golf Pumping Station - New Cairo City, Egypt.
- Pumping Station (3, 4 and 5), New Cairo City, Egypt.
- Sharm El-Shiekh plant, sharm el-shiekh, Egypt.
- Matrouh plant, Matrouh, Egypt.
- Sidi-Barani plant, Matrouh, Egypt.
5. Data Centers: ICG Team Experience (Standard Data Centers)
Data center standards remain unchanged and are not affected by the sector. For example, Tier 3 data center is a standard either it is implemented in financial sector or in any other sector. These standards present the availability level required. ICG team members involved in this scope of work has an extensive experience in the design and supervision of the implementation of standard data centers with all its tier types. The following list shows samples of these references:
- Agriculture Bank of Egypt (ABE)
- Supervising the write up of the RFP for establishing a modern tier 3 data center 1.5 Mega Watts (Dokki Headquarter). This includes all the data center subsystems design (power, cooling, racks, CCTV, access control, etc.).
- Supervising the implementation of the data center and holding the necessary meetings to follow up the progress and solving issues.
- Approval of the completion of the data center implementation
- Approving the write up of the RFPs for the switching, storage, servers, and security components.
- Approving the installation of all the active components into the data center
- Approving the write up of the RFPs for the software systems such as the core banking applications, AML, ECM, ERP, etc.
- Al-Baraka Bank of Egypt
- Writing up the RFP of Mohi El-din Abo El-Ezz headquarter data center including active and passive components.
- Supervising the implementation
- Approving the implementation
- Aziz Supercomputer (KAU – KSA)
- Design and implementation of Aziz Supercomputer (>12000 CPU cores, >14000 Cuda Cores, > 4000 Tensor cores, 5 PB Storage, 70 TB Memory, InfiniBand network) including all the utilities and foundation of the data center of the supercomputer. This international Mega project involves all the setup of the data center to host the supercomputer. Our consultants have led the design team, the implementation team, and the operations team.
- Gypto Pharma
- Writing the RFP and supervising the implementation of the data center of “Gypto Pharma” which is considered one of the Mega projects in Egypt.
- Black Sands Company Project
- Writing the RFP and supervising the implementation of the data center and all the networking of “Black Sands Company” which is considered one of the Mega projects in Egypt.
- Other References (samples only):
- Design and supervision of implementation of Ain Shams University Data Center
- Design and supervision of implementation of Egyptian E-Learning University Data Center
- Design and supervision of implementation of Egyptian Universities Network Data Center
- Design and supervision of the implementation of the Data Centers established by the Egyptian Company – one of the National Security Companies - such as the major 7 data centers of the Egyptian Passport Issuing system
- Design and supervision of the implementation of Security State Department Data Center and Networking (Nasr City Headquarter)
Writing the RFP and supervising the implementation of Dar Al-Fouad Hospitals Data Centers (6th of October and Nasr City) - Cairo Scan and Techno Scan Data center RFP write up
- Writing the RFP of the new 4 data centers of the national Universities including “Al-Galala University, Al-Alamain University, Al-Mansoura Al-Gadeeda University, and King Salman University” which is considered one the Mega projects in Higher Education.